The first strike with the tractor
Simply an awesome sight to see
Continued destruction
The front of the pool/showerhouse area (October 27)
The back of the pool/showerhouse area (October 27)
Cleaning out all the concrete from the old pool
The deep end of the pool is now nothing more than a bare pit
Nothing left of the old pool and showerhouse but a big hole (November 2)
The start of the frame for the new pool
The frame is almost done
Some of the reebar rods are in place for concrete (November 20)
A look at the bottom of the pool pit from inside the frame (November 20)
The concrete shell has been completed (December 6)
The shallow end of the pool after completion of the concrete (January 26)
The middle of the pool (January 26)
The construction on the pumphouse at the back of the pool (January 26)
Overall progress on the pool (February 25)
The pool pump house (April 10)
The shallow end of the pool (April 10)
The front side of the showerhouse (April 10)
The entire length of the pool and the showerhouse (April 10)
The TP side of the new showerhouse (May 2)
Progress on shower stalls (May 2)
The new pool slide
The pool and slide (June 3)
The finished pool (July 15)
The finished showerhouse (July 15)
The finished pool slide (July 15)
The finished showerhouse with Unami Lodge in the background (November 21)
The entire finished pool and showerhouse (November 21)